![]() ![]() ![]() In August 2013, EPA has determined that corrective action is now complete with controls at the Facility. The EI has status codes of “Yes, Under Control.” The "Current Human Exposures Under Control" Environmental Indicators (EI) was completed on May 5, 2009. The recommendations include further soil and groundwater sampling to determine the extent of impacts. ![]() On December 8, 2009, a Phase I Environmental Site Assessment was submitted under the Brownfields Grants Program by ePhase Inc. Results of the meetings and report have led the current owner, Ephrata National Bank, to seek assistance under the EPA Brownfields Program due to their desire to sell the property to the Borough of Ephrata which has plans to subdivide the property for multiple re-use scenarios. A Final Environmental Indicator Inspection Report for the Ephrata Manufacturing Company (EMCO) facility was submitted on April 27, 2009. An extensive review of both EPA and the Pennsylvania Department of Environmental Protection (PADEP) files was conducted as well as tow site visits on December 18, 2008, and March 24, 2009. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |